SafeTech Roofing and Windows
Home › Services › Roof Replacement
ROOF REPLACEMENT · BROWARD COUNTY

A new roof, done to code, and photographed at every stage.

Tile, shingle and standing-seam metal. HVHZ nailing patterns, 19/32in deck, sealed peel-and-stick underlayment, permits and HOA on us. We photograph the deck and underlayment before they’re covered, so you can see what your money bought.

SafeTech Roofing and Windows replaces residential roofs in Broward, Miami-Dade and Palm Beach, built to the Florida Building Code, including the High-Velocity Hurricane Zone standard in Broward and Miami-Dade. A 2,500 sq ft tile replacement typically runs $27,500–$55,000, shingle $13,750–$23,750, standing-seam metal $31,250–$62,500, every project backed by our 10-year workmanship warranty. Call (954) 665-3231 for a free written estimate.

Not sure you need a replacement? See our repair page → or read the 25% rule.

WHAT A REPLACEMENT INCLUDES

✓

Free inspection with drone survey where conditions allow

✓

Municipal permits and HOA submittals handled by us

✓

CDX plywood decking, 19/32in minimum, code-nailed

✓

Peel-and-stick underlayment, laps and terminations sealed

✓

10-year workmanship warranty on the full replacement, in writing

BOOK YOUR FREE INSPECTION →
✔ Licensed and insured · CGC1537934 · CCC1336954
⛨ 10-year workmanship warranty on replacements
★★★★★ 5.0 on Google
◈ BBB Accredited
CHOOSE YOUR ROOF

Three materials, one standard of install.

Every replacement gets the same deck, dry-in and paperwork. What changes is the finish on top, compare each in detail on its own page.

architectural shingle roof replacement in Broward County
SHINGLE

Architectural shingle

Rated to meet this zone's wind loads, six-nail HVHZ pattern, peel-and-stick dry-in. The most common replacement in Broward.

$13,750–$23,750 / 2,500 sq ft
See shingle page →
Concrete and clay tile roof replacement in Broward County
TILE

Concrete & clay tile

The look most Broward HOas ask for, longest service life when the underlayment is right. Needs structural review for load.

$27,500–$55,000 / 2,500 sq ft
See tile page →
Standing-seam metal roof replacement in Broward County
METAL

Standing-seam metal

24–26 gauge steel, concealed fasteners, Miami-Dade NOA-approved assembly. Longest-lasting system we install.

$31,250–$62,500 / 2,500 sq ft
See metal page →
REPAIR OR REPLACE

When a repair won’t do it any more.

A roofer has an obvious incentive to sell you a whole new roof. We’d rather tell you the truth and earn your next twenty years. Sometimes a repair is genuinely the right answer, and when it is, we’ll say so.

There’s also a code line that decides it for both of us: Florida’s 25% rule. On roofs built before the 2007 Florida Building Code (s. 553.844(5), F.S.), if more than a quarter of a roof section needs work in a 12-month window, the whole section must be brought up to current code. Repairing past that point is not legal, or in your interest.

Read our guide to the 25% rule →

A replacement is the honest call when

✕

Leaks are appearing in more than one place on the roof

✕

The underlayment has failed across large areas, not one spot

✕

The roof is near or past its expected service life

✕

The 25% rule has been triggered, a repair now forces a full re-roof anyway

✕

Your insurer is asking for a full replacement

If yours is an isolated leak on a roof with life left, that’s a repair. See our roof repair page →

Roof System Components

Metal Roof System Trims

Every roof is a system, field material plus the trims and flashings that keep water out. Tap a part on the house to see what it does.

Interactive illustration of a Florida home showing roof components.
2
Ridge Cap

Caps the peak where two roof planes meet, closed with foam or vented closures.

Linear feet · 10′ pieces
A REAL REPLACEMENT, PHOTOGRAPHED

One tile roof in Broward, torn off and rebuilt.

These are our own photographs from a full tile roof replacement in Broward County. Each stage, tear-off, deck, underlayment, tile back on, is on the same house, in order. Nothing was staged, and no stock photography was used. More on tile roofing →

Old shingles and underlayment torn off a Broward County roof and loaded into the dumpster, plywood decking now exposed 01 · TEAR-OFF
Stripped to bare deck. The old roof and every layer of underlayment removed. Everything the deck was carrying is now in the dumpster. This is the stage where hidden damage stops being hidden.
Repaired plywood roof decking on a Broward County home with rolls of Polyglass Polystick underlayment staged for install 02 · DECK READY
Deck sound, underlayment staged. Bad sheets swapped out for fresh CDX plywood, 19/32in minimum, nailed 6in on-center at the panel edges. Polyglass Polystick rolls staged and ready to lay.
Polyglass Polystick TU MAX peel-and-stick underlayment down across the roof deck with new concrete tiles staged in rows for install 03 · UNDERLAYMENT
The layer that actually keeps water out. Peel-and-stick underlayment carried across the whole roof. Tile sheds water; the underlayment is what makes the assembly watertight. Terminations sealed at every edge.
Fresh concrete tiles loaded across the underlayment mid-install on a Broward County tile roof replacement 04 · TILE GOING ON
Tile field taking shape. Concrete tiles set course by course, keyed and fastened to the deck through the underlayment. From here up, everything visible is finish work, the roof underneath it is already watertight.
Completed tile roof at the entry of a Broward County home, courses finished and hip line closed 05 · CLOSE-UP
Finish detail at the entry. Courses run true to the hip. The tile is set to lay water toward the field, not into the wall or the entry, details you can only judge close up.
Completed tile roof replacement in Broward County, Florida, aerial drone photograph over the finished roof 06 · FINISHED
Finished, from above. Drone shot over the completed roof, hip and ridge closed, valleys tight, no unfinished courses. This is the shot we photograph so the file can be closed with the permit and the insurer.

The layer that gets skipped, and the one that decides. On a new tile roof the customer sees tile. What actually keeps their house dry is a peel-and-stick underlayment, lapped and sealed correctly at every seam. A cheap replacement is where that step gets rushed, and where the next leak starts.

SHINGLE REPLACEMENTS

Shingle, finished at the valley and the gutter line.

The valleys, hip lines and drip edge are where a shingle roof is won or lost, so that’s what we photograph close-up on the finished job. If a contractor won’t show you the valley and the eave on finished work, that’s the part they cut corners on.

Broward code is a Six-nail pattern on architectural shingles to meet the current wind standard, not the four nails a lot of older South Florida roofs were built with. We nail to the current standard on every replacement, not to whatever was up there before.

See our shingle roofing page →
Completed shingle roof in Broward County, Florida, with a clean valley line and new drip edge along the eave
COMPLETED REPLACEMENTS

New roofs we’ve finished across South Florida.

Tile, shingle and standing-seam metal, photographed from the roof the day we finished.

See the full portfolio →
Lakefront blend barrel tile, mortar-set caps, SafeTech roof replacement TILE
Lakefront blend barrel tile, mortar-set caps
Charcoal six-nail field, vents flashed in, SafeTech roof replacement SHINGLE
Charcoal six-nail field, vents flashed in
Bronze standing seam, hips set true, SafeTech roof replacement METAL
Bronze standing seam, hips set true
Terracotta S-tile, hip-to-ridge junction, SafeTech roof replacement TILE
Terracotta S-tile, hip-to-ridge junction
Tan architectural shingle, gutter set, SafeTech roof replacement SHINGLE
Tan architectural shingle, gutter set
Terracotta standing seam, tile look without weight, SafeTech roof replacement METAL
Terracotta standing seam, tile look without weight
Terracotta S-tile, three-way hip junction, SafeTech roof replacement TILE
Terracotta S-tile, three-way hip junction
Ridge vent capped along the full ridge line, SafeTech roof replacement SHINGLE
Ridge vent capped along the full ridge line
Ridge cap and panel terminations, SafeTech roof replacement METAL
Ridge cap and panel terminations
Brown blend shingle, ridge capped at sunset, SafeTech roof replacement SHINGLE
Brown blend shingle, ridge capped at sunset
THE PROCESS

Six stages, from tear-off to inspection.

The same six on every replacement, tile, shingle or metal. You get a project coordinator, a written schedule and photographs at each stage.

01

Inspection & scope

Free inspection, drone survey where conditions allow, and a written scope with the ranges that could move once the deck is exposed. Nothing surprise-billed later.

02

Permit & HOA

Municipal permits, HOA submittals including color selection, and the uplift or pull testing the code requires. All handled by us.

03

Tear-off & deck

Old roof off, dumpster on site, deck inspected sheet by sheet. Any plywood failing the 19/32in / 6-nail standard is replaced, and photographed before it’s covered.

04

Underlayment

Peel-and-stick underlayment across the entire deck, valleys and drip edge worked in, laps and terminations sealed. This is the layer that actually keeps water out.

05

Roof system install

Tile, shingle or standing-seam metal installed to the current HVHZ wind standard. Six-nail on shingles, correct fasteners and clips on metal, code adhesive on tile.

06

Cleanup & final inspection

Magnetic sweep of the yard, dumpster gone, and the municipal final inspection. You get the closed permit and the photograph file for your records and your insurer.

Every job is run by a SafeTech project coordinator and inspected by us before final walkthrough. Photographs at each stage go into your file.

2026 BROWARD PRICING

What a new roof actually costs, on a 2,500 sq ft house.

These are the ranges we quote in Broward County in 2026, not aspirational, not clickbait low. Permits, decking and uplift testing sit on top of the material line and are shown separately.

MATERIAL / ITEM UNIT COST EST. TOTAL · 2,500 SQ FT
architectural shingle $5.50–$9.50 / sq ft $13,750–$23,750
Concrete / clay tile $11.00–$22.00 / sq ft $27,500–$55,000
Standing-seam metal $12.50–$25.00 / sq ft $31,250–$62,500
Permitting ~1–2% of contract $500–$1,500
Plywood decking (CDX 19/32in) $75–$125 / sheet installed $1,875–$4,375
Uplift / pull testing $350–$850 per inspection $350–$850
WHY RANGES, NOT ONE NUMBER

Product tier, roof pitch, complexity, tear-off layers and how much decking has to be replaced all move the total. You get a firm written number after inspection, before any work starts.

FINANCING

In-house financing available, subject to approval. Terms in writing before you sign. PACE also available through Home Run Financing and RenewPACE.

INSURANCE CLAIMS

Photograph documentation and a written report. We’re licensed roofing contractors, not public adjusters.

WARRANTY & COVERAGE

Three layers of cover, stated plainly.

Replacement warranties and repair warranties are not the same thing. Here’s what you get on a full replacement from us, and the exact limit of each.

OUR WORKMANSHIP

10-year warranty on full replacements

Every full roof replacement carries a 10-year workmanship warranty covering the whole roof, in writing at contract signing. Repairs carry a shorter 1-year warranty on the specific area repaired, we make the distinction because implying the longer term on the shorter job is how contractors get sued.

See our repair warranty →
MANUFACTURER COVERAGE

Limited lifetime, where the line offers it

Materials carry the manufacturer’s own warranty. Several premium product lines, including shingles from GAF, Owens Corning and CertainTeed, carry Manufacturer's own warranty (document provided) coverage when installed to specification.

Terms and transferability vary by product and manufacturer. You get the actual warranty document for what goes on your roof, not a summary.

THIRD-PARTY GUARANTEE

$30,000 Contractor Directorii deposit protection

As a verified Contractor Directorii member, every registered project carries $30,000 of independent deposit protection at no cost to you, protection that doesn’t depend on us still being in business a decade from now. Optional $250,000 full coverage is available for 2.5% of the contract amount.

applies to repairs and replacements alike. The one layer of cover that isn’t a promise from us about us.

ROOF REPLACEMENT QUESTIONS

The ones worth asking

If yours isn’t here, call and ask. We’d rather answer it before you commit to anything.

✆ (954) 665-3231

How much does a new roof cost in Broward County?

On a 2,500 sq ft roof: architectural shingle $13,750–$23,750, concrete or clay tile $27,500–$55,000, standing-seam metal $31,250–$62,500. Permits, decking and uplift testing sit on top of the material line, the full 2026 table is on this page.

How long does a roof replacement take?

Most residential replacements run a few days to about two weeks on site, depending on size, material and how much decking needs replacing. Tile takes longer than shingle. Permitting and inspection scheduling sit on top of that, and you get the expected window in writing before we start.

Do you handle the permits and the HOA submittals?

Yes, municipal permits and HOA submittals including color selection, plus the uplift or pull testing the code requires. That paperwork is on us.

Will I need new plywood decking?

It can only be confirmed once the old roof is off. Broward code requires a minimum 19/32in CDX plywood deck nailed 6in on-center at panel edges, so anything failing that has to go. We photograph the deck before it’s covered and quote decking at $75–$125 per sheet installed, so nothing arrives as a surprise.

What warranty do I get?

10 years on our workmanship, the manufacturer's own warranty, with the document provided for each product, and $30,000 of Contractor Directorii deposit protection at no cost on every registered project. Optional $250,000 full coverage is available for 2.5% of the contract amount. All three in writing before work begins.

Can I finance the roof?

Yes. In-house financing available, subject to approval. Terms in writing before you sign. PACE financing is also available through Home Run Financing and RenewPACE. Ask about it during your free inspection.

Do you document roof condition?

Yes. We photograph each section of the roof and give you a written report. Coverage questions go to your insurer or agent. We’re licensed roofing contractors, not public adjusters.

WHERE WE WORK

Roof replacements across South Florida

Based in Pembroke Pines, working throughout Broward County plus Miami-Dade and Palm Beach. We know which building department you’re dealing with and what your HOA will ask for.

Pembroke Pines Miramar Cooper City Davie Hollywood Fort Lauderdale Plantation Sunrise Weston Coral Springs Parkland

Ready for a written number?

Free inspection, photographs of what we find, and a firm written estimate. No charge, no obligation to use us.

✆ CALL (954) 665-3231
Roof Color Visualizer

See a color on a real roof before you choose

Click a swatch to swap a real photograph of the same roof style. Compare tile, metal and shingle in the colors Broward HOAs typically approve.

Finished tile roof in Broward County
Tile — Terracotta

Tile roofs

Concrete S-tile and flat tile in the colors Broward HOAs typically approve. The underlayment beneath the tile is the layer that actually keeps water out.

Visualizer uses SafeTech job photos. For HOA submittals, we bring physical samples so your board sees the exact color and profile. See the HOA checklist →
READY WHEN YOU ARE

Roof replacement starts with a free inspection.

We’ll inspect the roof, photograph the details that matter, and send a written itemized estimate within 24–48 hours. Permits, HOA submittal and inspections handled.

BOOK A FREE INSPECTION ☎ (954) 665-3231